Sheet straightening machineWMW Gotha UBR 16x2500 /1-10

Sheet straightening machine WMW Gotha UBR 16x2500 /1-10Sheet straightening machine WMW Gotha UBR 16x2500 /1-10Sheet straightening machine WMW Gotha UBR 16x2500 /1-10

Description

Machine was sold to America!
Customer: MERTS, LLC designs

cold sheet metal levelling machine
techn. dimensions:
- max. throughput between the end switch: 2650mm
equipment:
- 6 pcs roller conveyors for intake/feed and outlet/ run-out, model U-beam construction with each 1 gear motor per roll conveyor band approx. 6,0 kW, chain drive for all rolls, rolls dia.= 190mm
roll conveyor description:
1 x roller conveyor: 2 pcs. rolls, 2500mm length, roller distance center 800mm, size (W:2,8xD:1,15xH:0,77m)
3x roller conveyor: 3 pcs rolls, 2500mm length,
roller distance center 800/800 mm
size W:2,8xD:1,85xH:0,75m
1x roller conveyor: 4 pcs rolls, 3x2800mm + 1x2330mm length, roller distance center 800/800/550 mm / size W:2,8xD:2,4xH:0.77m
1x roller conveyor: 6pcs rolls,5x2500mm+1x2330mm length,roller distance center 800/400/400/280/270mm, size W:2,8xD:2,4xH:0,77m

Details

plate width2500mm
plate thickness16mm
smallest sheet thickness6mm
Number of Straightening rolls11Stück
roll diameter180mm
straightening roll diameter180mm
straightening feed10-16-20m/min
bending speed10m/min
total power requirement75kW
Weight approx.56t
space requirements approx. LxWxH5,0x2,5x4,0m

Work performed

- revise of 39 support mounts
- clean, inspect the bearings (replace if necessary), regrease
turning of the outer Diameter
- check of the levelling rolls drive gear, cleaning, checking,
- revision of 13 Cardan shafts
dismantling, cleaning, regrease, mounting
work up 11 piece straightening rolls
check for run-in points, hardness and diameter,
resurfacing via fine grinding
- repainting the entire machine
- replacement of defective oil seals and gaskets, replacing the bearings if necessary
- check of the pre-transmission
- cleaning, checking, replacement of defective oil seals and gaskets,
- replacing the bearings as needed
- verification of screw jack / cleaning, checking,
- replacement of defective oil seals and gaskets, replacing the bearings if necessary
- verification of the screw jack for height adjustment of the lower straightening rolls
cleaning, checking, replacement of defective oil seals and gaskets, replacing the bearings
if necessary
- check the main drive motor, hydraulic motor, 2x lift motors
check via measuring of all electric devices , test run, new bearings if needed
- straightening rollers bearing cleaning, checking, possibly bearing replacement, regrease
- lubrication of the main gearbox clean, if necessary exchange of filters, pipelines;